Residential drafting in Redmond and Tumalo.
Preedin Design drafts permit-ready plans and designs custom homes, garages, and shops for properties in Redmond, Tumalo, and the surrounding acreage, including Powell Butte. Inside Redmond city limits, plans are reviewed by the City of Redmond Building Division; Tumalo is an unincorporated community, so projects there are permitted through Deschutes County.
Acreage and infill
The Redmond and Tumalo area mixes suburban lots with rural acreage. Acreage projects usually combine a home with a shop or barn and depend on well, septic, driveway access, and orientation to the mountains; in-town projects depend on setbacks and lot coverage. We design for both.
Who reviews your plans
The City of Redmond Building Division reviews projects inside city limits and accepts applications through the state's online permitting system. Tumalo, Terrebonne, and other unincorporated areas are reviewed by Deschutes County; Powell Butte sits in Crook County. We confirm jurisdiction for your parcel before drafting.
Common questions
Where do I get a building permit in Tumalo, Oregon?
Tumalo is an unincorporated community in Deschutes County, so residential building permits are issued by Deschutes County rather than a city.
Can I add an ADU on my Tumalo property?
Tumalo is excluded from Deschutes County's rural ADU program because it is an unincorporated community, but other options may exist depending on zoning and septic capacity. We review your parcel before designing.
Services in Redmond & Tumalo
Residential CAD Drafting & Permit Plans
Permit-ready CAD sets: floor plans, sections, elevations, and construction details produced to local code.
Custom Home Design
From first sketch to construction documents for one-of-one homes in Bend, Sisters, Black Butte Ranch, and beyond.
Home Additions, Garages & Shops
Additions and detached garages and shops sized to the existing home, with matching rooflines and materials.
Official sources and resources
- City of Redmond Building Division
- Deschutes County Building Safety Division
- Deschutes County rural ADU research checklist
Codes and local rules change. Confirm current requirements with the reviewing agency before you build.
Planning a home in Redmond & Tumalo?
Every inquiry gets a reply within two business days with a scope, a fee, and an honest read on fit.
